Ohio shipyard to build floating breakwater

The following is the text of a news release from The Great Lakes Group: 

(CLEVELAND) — Great Lakes Shipyard has been awarded a contract by Whiskey Island Marina to fabricate a new floating breakwater.

The Shipyard will fabricate two (2) 150’ long steel cylindrical modules that will be bolted together and anchored in the lake bottom in front of the marina. The project is to be completed by mid-November.

The 10-foot diameter breakwater is used for wake attenuation to protect the boats and docks in the marina basin from heavy weather and is ballasted to the 6.5’ waterline.

The Shipyard built a similar floating breakwater for Perry’s Landing Marina, Erie PA in 2010. That project involved the assembly of five (5) 40’ x 5’ wide x 8’ sections, ballasted to the 4.5’ waterline.

By Professional Mariner Staff